May 10, 2016 / 3:57 PM / a year ago

BRIEF-Enbridge inspects sites for safe restart after wildfires

May 10 (Reuters) - Enbridge Inc :

* Enbridge inspects sites for safe restart after wildfires

* Crews have been inspecting facilities and pipelines in Fort Mcmurray region

* As fires retreat in some areas, Enbridge workers have been able to conduct field assessments of several of its sites

* Currently finalizing plans to repair and restart system and working to assess available utility power supply needed to safely return to service

* Inspections of Athabasca and Cheecham terminal facilities indicate they have been largely unaffected by fires

* As of May 10, Enbridge Cheecham facility remains closed

* All enbridge pipelines in and out of Cheecham terminal continue to be isolated and shut down

* Limited volumes are currently flowing on Line 19, initiating out of Kirby Lake facility

* Athabasca terminal continues to operate with a minimum staff complement. Source text for Eikon: Further company coverage:

0 : 0
  • narrow-browser-and-phone
  • medium-browser-and-portrait-tablet
  • landscape-tablet
  • medium-wide-browser
  • wide-browser-and-larger
  • medium-browser-and-landscape-tablet
  • medium-wide-browser-and-larger
  • above-phone
  • portrait-tablet-and-above
  • above-portrait-tablet
  • landscape-tablet-and-above
  • landscape-tablet-and-medium-wide-browser
  • portrait-tablet-and-below
  • landscape-tablet-and-below