Sturgeon oil terminal in Alberta to shut for 16 hours Tuesday

Tue Oct 29, 2013 7:15am EDT
 
Email This Article |
Share This Article
  • Facebook
  • LinkedIn
  • Twitter
| Print This Article
[-] Text [+]

Oct 29 (Reuters) - The 350,000 barrel Sturgeon oil terminal near Redwater, Alberta will be shut for 16 hours on Tuesday, Access Pipeline Inc said in a community line message for local residents.

Access Pipeline Inc is a joint venture between Devon Energy Corp and MEG Energy Corp, which operates two pipelines delivering diluent to operators in the Canadian oil sands.

A 345-kilometre dual line connects to MEG Energy's Christina Lake project to blending and refining facilities in the Edmonton area, according to the company's website.